Cranston Ridge Construction Update in Cranston Place

Despite the cold weather we’re pushing through, at Cranston Ridge Building 1 the exterior siding is coming along and we’ve also got the stone started too;

IMG_0167   IMG_0170   IMG_0173

Inside the building the Cabinets are being installed on the first floor, on level 2 the mud and taping is complete and ceilings are being textured, boarding is underway on level 3 and on the forth floor poly and insulation is wrapping up;

IMG_0198   IMG_0211 - Copy   IMG_0215   IMG_0217 - Copy   IMG_0221 - Copy   IMG_0233

Building 2 is moving along as well, the windows and patio doors are being installed and the roof has been sheathed. On the inside rough-ins of mechanical and electrical systems are underway;

IMG_0169   IMG_0227   IMG_0197   IMG_0174   IMG_0175   IMG_0176   IMG_0182

Building 3 the walls are poured and the under slab services are being installed;

photo 1   photo 2

During the milder weather since the last post we were able to get the first lift of asphalt down;

IMG_0123