Happy New Year

After a nice break we’re back it, refreshed and raring to go! In Building 1 on the main floor the stage one finishes have been sprayed and wall tile has started, on level 2 the cabinets are in and the stage one finishes are being installed, the cabinets are now delivered and being installed on Read More

Auburn Walk

It’s exciting to get started on a new project, we’ve now fenced off the site, scraped and cleared the vegitation and dropped off gravel for the deep services installation starting next week;   

Cranston Ridge Construction Update

Despite the cold weather we’re pushing through, at Cranston Ridge Building 1 the exterior siding is coming along and we’ve also got the stone started too;       Inside the building the Cabinets are being installed on the first floor, on level 2 the mud and taping is complete and ceilings are being textured, boarding Read More

Cold Weather Construction

Winter is hear but its business as usual! At Cranston Ridge Bldg 1 the siding is underway on the outside, on the inside insulation, drywall, mudding and taping is underway on the upper floors with plumbing in the parkade;           Here is a picture of the shaft in building 1 ready for Read More

Rough-Ins and Framing

Cranston Ridge is a busy site, Building 1 is in full swing with Plumbing Rough-ins on level 3, Electrical Rough-ins on levels 1 and 2 and the roofing just starting.        Building 2 had the suspended slab poured last week and now the framers are hard at work on the first floor;    Read More

Slab On Grade

Things are moving along at Sage Place, on Wednesday we poured the Slab On Grade for the Parkade of Building 1 and we poured the ramp walls the day before;       Next week we’re excited to start the excavation of building 2. Below are few progress photos;    

Sage Building 1 Parkade

The Walls have been formed and poured for the Parkade at Sage Building 1 and now we’re working on installing the services that go under the slab on grade which is planned to be poured next week.         Site work also continues with the installation of the retaining wall along the south property Read More

Framing and Forming

Despite the weather Cranston Ridge is a very busy and exciting site with two buildings well under construction; Cranston Ridge Building 1 is currently standing roof trusses and has started the rough-ins of the electrical and mechanical systems. Cranston Ridge Building 2 is now having the suspended slab formed and the mechanical sleeves installed.   Read More